top of page
Pictures and Process

Container 35 KWh Unit
Contrution - 30 KWh Unit

Chassis Welded
Welded & ready for priming

Flywheels Resting Legs
Parts welded, align & prime

Flywheels Resting Legs
Painted

Frame
Prime Coating

Frame
Final Under Coating

Frame
Final Under Coating

50k Lbs Towing Hooks
For draging and lifting

Hooks & Round Tubing
For drag, lift & tide down

Forklift Holes
To lift and load

Forklift Holes
Fully welded from side to side

Solid Steel Mass
Shifting mass primed

Shifting Solid Mass
Final Coad

3 Phase Electric Motor
Heavy duty winding with brake

Gear Box
Main gear box

Synchronous Generator
Heavy duty winding

Flywheels
Heavy duty solid steel

Flywheels Assembling
Mechanical assembling

Flyweels Assembling
Mechanical assembling

Flywheels assembling
Mechanical assembling

Mechanical assembling
Mechanical assembling
bottom of page